Mon: 1/27/20 |
Get Students 5.1 Graph Paper; Begin 5.1 Pet Sitters.pptx (Complete through the What Do You Think Slide); Begin 5.1 RSG
|
Tue: 1/28/20 |
Complete 5.1 (Discuss Points in the Feasible Region that will Maximize Income); Go over a couple of the "Go" Problems |
Wed: 1/29/20 |
Pass out the 5.2 graphs; Begin 5.2 Too Big, or Not Too Big (2017).pptx (Complete 1-3 in the activity): HW: Begin the RSG |
Thu: 1/30/20
|
Complete 5.2 Too Big, or Not Too Big (2017).pptx (Begin on #4 and do each problem, using the last slide to set students up for their Exit Slip); Go over a couple RSG problems; 5.2 Exit Slip; HW: Complete the 5.2 RSG (End of Semester 1) |
Fri: 1/31/20 |
Exit Slip; HW: Complete the 5.2 RSG |
Mon: 2/3/20 |
Begin 5.3 Some of One, None of the Other (2017).pptx (1-3); HW Begin the 5.2 RSG |
Tue: 2/4/20 |
Complete 5.3 Some of One, None of the Other (2017).pptx; HW Complete the 5.2 RSG |
Wed: 2/5/20 |
Complete 5.4 Pampering and Feeding Time (2017).pptx; Begin the 5.4 RSG |
Thu: 2/6/20 |
Course Interest Survey; Launch 5.5 (Quiz Review); Go over #10 on the RSG, then have students complete the RSG
|
Fri: 2/7/20 |
Quiz 5A
|
Mon: 2/10/20 |
Begin 5.5 All For One, One For All (2017).pptx (Complete the first 4 problems in the Activity); Begin the 5.5 RSG |
Tue: 2/11/20 |
Complete 5.5
|
Wed: 2/12/20 |
Begin 5.6 More or Less.pptx (Complete 1-5); Begin the 5.6 RSG |
Thu: 2/13/20
|
Complete 5.6 More or Less.pptx; Complete the 5.6 RSG |
Fri: 2/14/20 |
5.7 Get to the Point (2017).pptx (Complete this activity in class.)
|
Mon: 2/17/20 |
Mid-Winter Break |
Tue: 2/18/20 |
Mid-Winter Break |
Wed: 2/19/20
|
Complete the 5.7 RSG ***Give any student who has completed the RSG's for 5.7 thru 5.9, their copy of the Module 5 Make-Up Review (2019).pptx
|
Thu: 2/20/20
|
5.8 Shopping for Cats and Dogs (2017).pptx; Complete the 5.8 RSG
|
Fri: 2/21/20 |
5.9 Can you get to the Point, Too (2017).pptx; (1,4,5); HW: 5.9 RSG |
Mon: 2/24/20 |
Complete 5.9; Module 5 Review |
Tue: 2/25/20 |
Module 5 Make-Up Review Presentation (2019).pptx
|
Wed: 2/26/20 |
Module 5 Exam
|
Thu: 2/27/20
|
Mod 6 Materials have not arrived; Notebook Check and New Seats |
Fri: 2/28/20 |
Pass out Module 6; Begin 6.2 Is It Right.pptx (Do the first three experiments); Begin the 6.2 RSG
|
Mon: 3/2/20 |
Complete 6.2
|
Tue: 3/3/20
|
Complete 6.3 Leap Frog.pptx; Complete the 6.3 RSG
|
Wed: 3/4/20 |
Begin 6.4 Leap Year.pptx (Complete Part 1); HW Begin the 6.4 RSG |
Thu: 3/5/20 |
Complete 6.4
|
Fri: 3/6/20 |
Quiz A
|
Mon: 3/9/20
|
Begin 6.5 Symmetries of Quadrilaterals.pptx (Complete Part 1); Begin the 6.5 RSG
|
Tue: 3/10/20
|
Complete 6.5 (Trapezoid... Print the last 4 slides for students)
|
Wed: 3/11/20
|
6.6 Symmetries of Regular Polygons.pptx; Complete the 6.6 RSG
|
Thu: 3/12/20 |
Begin 6.7 Quadrilaterals- Beyond Definition.pptx; HW Begin the 6.7 RSG |
Fri: 3/13/20 |
Continue 6.7; HW Continue the 6.7 RSG; Mod 6 Review.pptx |
School Closure |
This cell will contain the presentation of the Module 6 Review. The cells below will contain updated lessons and reviews for the remainder of our IM1 curriculum.
I would suggest having Module 6 mastered and then reviewing Modules 7, 8, and our Data Analysis Material.
|
4/12/20 Quarantine |
Mod 6 Review Presentation.pptx |
Mon: 3/16/20
|
Complete 6.7; HW Complete the 6.7 RSG; Mod 6 Review.pptx |
Tue: 3/17/20
|
Mod 6 Review.pptx |
Wed: 3/18/20
|
Mod 6 Review Presentation.pptx
|
Thu: 3/19/20
|
Mod 6 Review Presentation.pptx; Summative Assessment (1-9, 19-pts.)
|
Fri: 3/20/20 |
Mod 6 Review Presentation.pptx; Summative Assessment (10-16, 20-pts.)
|
Mon: 3/23/20
|
Mod 6 Review Presentation.pptx; Summative Assessment (17-23, 30-pts.)
|
Tue: 3/24/20
|
Tests Available; Seats; Mod 7; Progress Reports |
Wed: 3/25/20
|
Complete 7.1 Under Construction.pptx (begin on Slide 15); HW Begin the 7.1 RSG |
Thu: 3/26/20
|
Complete the 7.1 RSG (25-minutes); Begin 7.2 More Things Under Construction.pptx (Get through #3 today); HW Begin the 7.2 RSG |
Fri: 3/27/20
|
Pass Out 7.2 Steps for Constructions.pptx; Complete 7.2 More Things Under Construction.pptx (Begin at Constructing a Hexagon); HW Complete the 7.2 RSG
|
Mon: 3/30/20
|
Begin 7.3 Can You Get There From Herroe.pptx (Do the activity with axes, using a translation and a reflection); HW Begin the 7.3 RSG
|
Tue: 3/31/20
|
Complete 7.3 Can You Get There From Here.pptx (Do the activity w/o axes, using a translation, rotation, and reflection); HW Begin the 7.3 RSG ***Students will need a new graph
|
Wed: 4/1/20
|
Begin 7.4 Congruent Triangles.pptx (Patty Paper); HW Begin the 7.4 RSG (Today you can do the Ready & the Go)
|
Thu: 4/2/20
|
Continue 7.4 Congruent Triangles.pptx; HW Continue the 7.4 RSG
|
Fri: 4/3/20
|
Complete 7.4 Congruent Triangles.pptx; HW Complete the 7.4 RSG
|
Mon: 4/13/20
|
Begin 7.5 Congruent Triangles to the Rescue.pptx; HW Begin the 7.5 RSG
|
Tue: 4/14/20
|
Complete 7.5 Congruent Triangles to the Rescue.pptx; HW Continue the 7.5 RSG
|
Wed: 4/15/20
|
Complete the 7.5 RSG (20 minutes); Begin 7.6 Justifying Constructions.pptx Complete the first two problems); HW Begin the 7.6 RSG
|
Thu: 4/16/20
|
Complete 7.6 Justifying Constructions.pptx; HW Complete the 7.6 RSG (This is the last day for full credit on any section of Module 7)
|
Fri: 4/17/20
|
Module 7 Review (2017).pptx; Module 7 Study Guide (2017).docx
|
Mon: 4/20/20
|
Module 7 Review (2017) Presentation.pptx (Get through five constructions) *** Make sure students are putting their steps on a separate piece of paper.
|
Tue: 4/21/20
|
Module 7 Review (2017) Presentation.pptx ***Many students are working the trade show. I will have to go over some review with them before we begin the exam.
|
Wed: 4/22/20
|
Memorial Day |
Thu: 4/23/20
|
No Class (SBAC Testing) |
Fri: 4/24/20
|
Module 7 Exam (Form B); 2nd Period--> 7:40-9:35, 4th Period--> 9:40-10:40, 11:10-12:05 |
Mon: 4/27/20 |
New Seats; Module 8 Material; Tests Available (SBAC Testers need to test); Notebooks: Progress Reports
|
Tue: 4/28/20 |
Begin 8.1 Go the Distance.pptx (Complete 1-4); HW Begin 8.1 RSG
|
Wed: 4/29/20
|
Complete 8.1; HW Complete 8.1 RSG (Must be turned in today for full credit) |
Thu: 4/30/20 |
Begin 8.2 Slippery Slopes.pptx (1-8); HW Begin 8.2 RSG
|
Fri: 5/1/20
|
Complete 8.2; HW Complete 8.2 RSG
|
Mon: 5/4/20 |
Complete 8.3 Prove It.pptx; HW Begin the 8.3 RSG |
Tue: 5/5/20 |
|
Wed: 5/6/20
|
|
Thu: 5/7/20
|
|
Fri: 5/8/20 |
|
Mon: 5/11/20
|
|
Tue: 5/12/20 |
|
Wed: 5/13/20
|
|
Thu: 5/14/20 |
|
Fri: 5/15/20 |
|
Mon: 5/18/20
|
|
Tue: 5/19/20
|
|
Wed: 5/20/20
|
|
Thu: 5/21/20
|
|
Fri: 5/22/20
|
|
Mon: 5/25/20
|
|
Tue: 5/26/20
|
|
Wed: 5/27/20
|
|
Thu: 5/28/20
|
|
Fri: 5/29/20 |
|
Mon: 6/1/20 |
|
Tue: 6/2/20
|
|
Wed: 6/3/20
|
|
Thu: 6/4/20
|
|
Fri: 6/5/20
|
Complete the 8.3 RSG; Module 8 Review.docx (Today is the last day for credit on Module 8 HW)
|
Mon: 6/8/20 |
Review Workday |
Tue: 6/9/20 |
Module 8 Review Presentation.pptx (Get through 1-14 today)
|
Wed: 6/10/20
|
Complete the Module 8 Review Presentation.pptx; Begin the Exam (Some students will finish.) *** Students may hang on to their review until tomorrow.
|
Thu: 6/11/20
|
Collect the review and complete the Module 8 Exam; Kelly's Quadrilaterals Activity--> Special Quads (Can be part of the Final Review).docx
|
Fri: 6/12/20
|
Data Analysis Activity Presentation.ppt; (Get through the Histogram Today)
|
|
Complete the Data Analysis Activity Presentation.ppt; Groups of three and begin rough drafts
|
|
Complete and get rough drafts OK'd; Begin Posters
|
|
Complete Posters--> 40 Pts. |
|
Finals (No Class) |
|
Progress Reports and Placement |
|
Field Day |
Supplements |
Begin 6.1 Leaping Lizards!.pptx |
|
Transformations Jigsaw (20 points) |
|
Semester 2 Final Review (Gibbons, 2017).pptx; (Groups that are not done with their DA Project may complete the project before beginning the review.); Semester 2 Final Review Handout (Gibbons 2017).pptx |
|
Final Review Workday
|
|
Final Review Workday |
|
Semester 2 Final Review Presentation (Gibbons, 2018).pptx (Today we will get through #9)
|
|
Semester 2 Final Review Presentation (Gibbons, 2018).pptx (10-14)
|
|
Semester 2 Final Review Presentation (Gibbons, 2018).pptx (Complete the Review Pres.)
|
|
1st Period Final 7:40-9:30 |
|
2nd Period Final 7:40-9:30
|
|
Last Day (Placement)
|
Comments (0)
You don't have permission to comment on this page.